Lead dressed around the base of a brick chimney stack, family run roofers offering lead work

Family Run Fylde Coast Roofers

Lead Work in Lytham St Annes

Lead seals the awkward joins on a roof, as long as each piece is cut to size and fixed so it can move.

  • A free quote and no obligation
  • Our owner started roofing at 17
  • A guarantee on all our work
  • Working across the Fylde coast

Your Free Roof Quote

A few details are all we need to start your free quote.

What you send us is only used to answer your enquiry and prepare a quote. It is not shared for marketing and we hold it for up to 12 months. Find out more in our privacy notice.

  • Quotes Are Free With no obligation

  • Insured Work Public and products liability

  • Family Run Lytham St Annes and the Fylde coast

  • Our Guarantee On every roofing job

Lead Work

Lead moves, and good lead work allows for it

Lead expands in the sun and shrinks as it cools, far more than steel does. Ignore that movement and the metal ripples, buckles and eventually cracks. Oversized pieces, often made worse by too many fixings, are the main cause of failed lead work. So flashings are kept to lengths of no more than 1.5 metres, with 100mm laps where they join, and fixings hold the lead in place without pinning it down. A single long run can look neat, but it builds in the fault that will split it later.

Beside the sea, wind works at any free edge, so edges need clips to stop them lifting. Guidance spaces clips at 300mm to 500mm depending on exposure and advises against lead clips in moderate to severe exposure, which points to copper or stainless steel here. What runs over the metal matters as well. Water coming off moss and lichen is acidic and slowly eats into lead, and bird droppings do similar harm. Valleys and parapet gutters need keeping clear of both, and of blown sand at the outlets.

Where lead goes depends on what it meets. Against a wall or chimney, slates and plain tiles are usually weathered with soakers under each course and a step flashing over them. Profiled interlocking tiles take a step and cover flashing, and a flat roof edge takes a cover flashing. We work on all of these, along with valleys, dormers, complete lead roofs and ornamental lead work. On older buildings we study what is there and how it has failed before suggesting anything, because sound old lead may only need a careful repair.

  • Lead flashings and soakers
  • Chimney, dormer and valley lead work
  • Complete lead roofs and repairs
  • Ornamental lead work
  • Refixing lifted or loose flashings
  • Lead on period and historic buildings
Lead lined valley running down past the scaffold, a closer view relating to lead work

Signs to Look For

Reading the warning marks on old lead

  • Flashing lifting from the wall

    Wind vibration and swings in temperature can stop the wedges holding, and the pointing in the joint then cracks. The lead starts to lift and rain gets in behind it. Caught early, a loose flashing can often be refixed and repointed rather than replaced.

  • Ripples, ridges or fine cracks

    A raised ridge across a gutter or a hairline split usually tells you the piece is too large or fixed too tightly. Repeated movement has fatigued the metal. A patch alone leaves that cause in place, so the size of the piece and its fixings need correcting too.

  • White powder at laps and rolls

    White staining or powder at the joints can mean moisture is trapped under the lead and corroding it from below. It is not always serious, but holes on the surface can sit above heavy damage, and lifting a section is the only reliable check.

Step by Step

Getting lead to fit and stay put

  1. Work out why it failed

    Before cutting anything we look at the size of each piece, how it was fixed and what surrounds it. Copying a detail that failed would simply repeat the fault. You then get a quote, free of charge and free of obligation.

  2. Expose what lies beneath

    The old lead comes off and the surface below gets a close look. Rotten boards or loose masonry pause the job until we have explained what we found and quoted for that work separately.

  3. Cut, dress and fix

    Lead is cut to safe lengths and dressed to follow the roof. Flashings are turned at least 25mm into the mortar joint, wedged, lapped and clipped along their free edges.

  4. Point up, then check laps

    Joints are pointed, keeping fresh mortar off the exposed lead because its alkalis can damage or stain the metal. We then check every lap and clip before clearing the site.

Our Photos

The Kind of Roofing We Do

A selection of photos taken on our own roofing jobs.

  • Old lead valley opened up during a repair, photo from a job covering lead work
  • Worn valley uncovered once the tiles were lifted, part of our lead work service
  • Freshly formed valley running down a slate roof beside the scaffold, taken on a job involving lead work
  • Slates trimmed back to a valley prepared with battens and membrane, one of our photos of lead work

Browse all our photos

Good to Know

Questions About Lead Work

Why is there white staining below our new lead?

New lead forms a white carbonate as it first weathers, and rain can carry that onto the slates, tiles or brickwork below. Roofers usually guard against this with patination oil, applied as soon as possible after fitting, which gives a protective film and limits the staining. Over time the surface settles to a dull grey patina. White marks on much older lead are different and deserve a closer look.

Can a split in old lead be repaired?

In many cases, provided the surrounding lead is sound. On a flashing, a small piece can be let in and wedged, lapping at least 100mm either side of the crack. Small splits can also be patched by lead welding, which is hot work needing strict fire precautions. Sealing tape is only a stopgap. If splits keep appearing, the piece is probably oversized or overfixed, and renewal is the sounder route.

Are lead free flashings a sensible alternative to lead?

They have their place. Bitumen based flashing sheets are sold for many of the same details, and with no scrap value they can reduce theft. One maker calls its sheet suitable for most lead applications, so each detail needs checking. On a listed building, changing the material will usually need listed building consent. After theft, Historic England treats like-for-like replacement as highly desirable, though it may support alternatives where the risk is too high. Check with your council.

What do the code numbers on lead sheet mean?

They describe thickness and weight. Code 3 is about 1.32mm, Code 4 about 1.8mm and Code 5 about 2.24mm, with heavier codes above. Code 3 is generally limited to soakers, while Code 4 is the common choice for flashings, pitched valleys and dormers. Wider aprons and more exposed positions can call for a heavier code, so the right one depends on the size of the piece and the site.

Also Worth a Look

Other Work We Take On

  • New battens and underlay meeting a brick chimney, chimney repairs alongside lead work, all from one family firm

    Chimney Repairs

    Stacks repointed, flashings renewed and loose pots made safe.

  • Slate covered roof below a deep blue sky, slating alongside lead work, all from one family firm

    Slating

    Slate roofs renewed and repaired with materials to suit the building.

  • White casement windows in a dark tile hung dormer, dormers and loft conversions alongside lead work, all from one family firm

    Dormers & Loft Conversions

    Dormers and loft rooms that add space without moving house.

New red and brown tiles finished up against an older dark roof, free quotes for lead work with no obligation

Talk to Us About Lead Work

Your quote costs nothing and there is no obligation.